In memory

Home · Chapters

Hands

Carpentry and Construction

Measured twice

Everything level, everything square, everything finished properly.

A Jack of all trades, and a master of most. Measure twice, cut once — and he kept both thumbs.

He built about seven airplanes.

The houseboat was the last of it. He started it on 3 May 2024, and when spring came in 2026 he was about three months from finishing it — so it was never launched, and nobody ever found out whether it floats.

Most of it he did himself, with the occasional friend. The pontoons came from an old-timer in Hudson's Hope and had been used on Williston Reservoir while the Bennett Dam was being built, and getting them to the lake was a job in its own right: Trucking the barges to Babine Lake this week. The house went up on Babine Lake itself, not far from Granisle.

Films

From this chapter

Construction of Del’s houseboat

Doug Weibe & Clayton Sheen
Gabled roof supports on the Houseboat
Gabled roof supports on the Houseboat